<dd id="2y0os"><s id="2y0os"></s></dd><code id="2y0os"><abbr id="2y0os"></abbr></code>
  • <rt id="2y0os"><abbr id="2y0os"></abbr></rt><ul id="2y0os"><source id="2y0os"></source></ul>
    <menu id="2y0os"><kbd id="2y0os"></kbd></menu>
    <dd id="2y0os"><s id="2y0os"></s></dd>
    <center id="2y0os"><td id="2y0os"></td></center>
    <tbody id="2y0os"></tbody>

    The Foundation 3

    Date: 2024.02.23

    Jiangsu Datang Binhai Offshore Wind Farm Project contains 50 MySE3.0-135 wind turbines in construction. This wind farm mainly contains the mealy sand and silty clay, the monopile foundation is finally chosen for the purpose achieve cost optimization that depend on the seabed elevation of -17.5m~ -22m. There are almost 25 wind turbines have been installed until June 15th, 2019.

    97国产一区二区三区视频,欧美伊久线香蕉观新在线,国产成年无码久久久久下载,久久99热精品免费观看 国产一级一交一乱视频 成a在线观看视频播放
    <dd id="2y0os"><s id="2y0os"></s></dd><code id="2y0os"><abbr id="2y0os"></abbr></code>
  • <rt id="2y0os"><abbr id="2y0os"></abbr></rt><ul id="2y0os"><source id="2y0os"></source></ul>
    <menu id="2y0os"><kbd id="2y0os"></kbd></menu>
    <dd id="2y0os"><s id="2y0os"></s></dd>
    <center id="2y0os"><td id="2y0os"></td></center>
    <tbody id="2y0os"></tbody>